Panel Upgrades & Service Installs
100A to 200A.
Permit to final, one crew.
Full electrical service upgrades: panel, meter can, mast and weatherhead, grounding and bonding, trenching for underground runs. We file the permit, coordinate the utility, and walk the final inspection.
What a service upgrade includes
- 200A service installation — panel, breakers, and load calculation
- Meter can and mast replacement, weatherhead brought to code
- Grounding and bonding corrected to current NEC
- Trenching and underground service runs to the pad
- Permit filing and utility coordination handled by us
- Final inspection walked with the inspector — through the first time
200A
service installs, permitted and inspected
1 CREW
from permit filing to final inspection
IN WRITING
scope, price, and warranty — before work starts
